CATALYST WROCŁAW AT A GLANCE:

marker
  • located in the western part of Wrocław
  • right next to the A8 motorway, near the 
    crossroads of the A4 and 
    A8 motorways
  • three minutes by car from Wrocław Airport
network technology

A modern facility with technically advanced and compliant solutions

star

HILTI’s biggest service centre in Europe is located in the complex 

park symbol
Grey map of Poland

WRO

Wrocław, a key economic hub in Poland, boasts a diverse industrial base with strengths in manufacturing, technology, automotive, logistics, and research. It attracts investments in technology and research, fostering innovation through technology parks and business incubators. Its strategic location and robust infrastructure make it ideal for logistics and distribution centers, leading to increased activity in these sectors. Significant investment has been made in industrial infrastructure, including the development of modern facilities in industrial parks and zones, further enhancing its economic development.

WROCŁAW IN NUMBERS 

people
674 k
population
Wrocław shape on a graph
293 sqkm
city area
enlargement of the cube
4.1 m sqm
population*
* Lesser Silesian voivodeship
park symbol

WROCŁAW IN NUMBERS 

people
674 k
population
Wrocław shape on a graph
293 sqkm
city area
enlargement of the cube
4.1 m sqm
population*

GREAT LOCATION

Wrocław lies on the banks of the Oder in the Silesian Lowlands of Central Europe, roughly 40 kilometres from the Sudeten Mountains to the south. As of 2023, the official population of Wrocław is 674,132 making it the third largest city in Poland. Population of the Wrocław metropolitan area is around 1.25 million. 

CATALYST WROCŁAW by LemonTree is near the A8 motorway and 26.8-kilometre long Wrocław Motorway Bypass.

KEY DISTANCES

plane starting
Wrocław Airport 1,5 km
motorway
A8 Motorway 4 km
motorway
A4 Motorway 9 km
marker at center
Wrocław City Centrę 9 km
Palace of Culture and Science
Warsaw 340 km
city hall
Berlin 340 km

VICINITY OF WROCŁAW AIRPORT

Wrocław Airport, and its strategic location within Europe contribute to city’s accessibility and connectivity, making it easier for businesses to engage in international trade. 

park layout
ENTRANCE
RELAXATION ZONE
PARKING
PARKING
PARKING
ELECTRIC CAR CHARGERS
RELAXATION ZONE
PARKING
PARKING
DOCKS
ELECTRIC CAR CHARGERS
DOCKS
CATALYST WROCŁAW by LemonTree symbol

TECHNICAL SPECIFICATION

storage height

Storage height 10 m

pump

Heat pump

column grid

Column grid

led lighting

LED lighting: 300 lx in the loading zone 200 lx in the storage area

fire resistance

Fire resistance above 4000 MJ/m2

destratifiers

Destratifiers

daylight

Daylight illumination in the dock area

floor load

Floor load capacity 5 tons/m2 

wall insulation

Increased wall insulation

photovoltaics

Photovoltaics 50 kWp

park symbol

TENANTS

CATALYST WROCŁAW by LemonTree is fully leased. The building remains under the management of the LemonTree management team. Our tenants create technological hubspot. 

The anchor tenant is HILTI a world leader in the design and manufacture 
of cutting-edge technologies, software and services for the professional 
construction industry. 

HILTI IN CATAYLST WROCŁAW IS THE MOST MODERN AND ONE OF THE LARGEST HILTI SERVICE CENTRE WORLDWIDE.

LEMONTREE CREATED A MODERN SPACE ACCORDING TO TECHNICAL SPECIFICATION REQUESTED BY THE CLIENT:

Facade

Installation of an epoxy floor on the entire surface of the hall - protection against spilling grease/oil, etc.

star

Higher standard of finishing of office rooms (interior glazing, carpeting, installations in conference rooms, windows overlooking the hall)

tableware

Preparation of the kitchen and canteen in the office module

pump

Rooftop ventilation units with heat pumps and own automation controlled by the temperature in the hall

extraction

Istallation of a dust extraction unit with station extraction

busbars

250 A and 160 A busbars enabling flexible power 
connections

compressor

Compressed air installations 
at each station

bolts

150 kVA generator, with 
Automatic Transfer Switch system

bolt

Dedicated electrical installation distributed in accordance with the layout of the workstations

bumpers

Protective bumpers inside the hall - prevent damage to the wall by forklifts and pallet trucks

sun

Additional light strips in the façade ensuring 12.5% daylight illumination

separation

Separation of internal rooms (test room, service room)

terrace

Outdoor terrace on the roof of the office module - in the arrangement process

bolt with arrows up

Increased electrical 
transformer power for the 
HILTI process

Intersection 1

Maciej Krawiecki
Maciej Krawiecki COO, Head of Development & Leasing